Charging at home is often convenient, but its cost depends on more than the advertised electricity rate. This guide gives you a repeatable worksheet for comparing flat-rate, time-of-use, EV-specific, and solar-assisted charging, including delivery charges, charger losses, fixed fees, exports, and demand charges.
Overview
The simplest estimate for home EV charging is:
Charging cost = energy pulled from the utility × effective electricity rate
That estimate is useful only when the rate includes every applicable per-kilowatt-hour charge. Your bill may separate generation, transmission, distribution, delivery, taxes, and other variable charges. A plan may also have a monthly customer charge, time-based prices, an EV enrollment fee, or a demand charge based on your highest short-term power draw.
To compare plans fairly, calculate three results:
- Cost per charging session: what it costs to add a chosen amount of energy.
- Cost per 100 miles: a vehicle-neutral comparison that accounts for efficiency.
- Monthly charging cost: the amount attributable to driving, with fixed fees shown separately.
Home charging is generally easiest to compare with the energy shown by your vehicle or charger and the energy billed by your utility. These numbers differ because charging equipment uses some electricity as heat and for standby functions. If you only know the energy added to the battery, apply a clearly stated loss assumption rather than treating the battery figure as the meter figure.
How to estimate
1. Start with driving and vehicle efficiency
Record your expected monthly miles and your vehicle’s efficiency in kilowatt-hours per 100 miles. Use the vehicle’s onboard energy screen, owner documentation, or several weeks of observed use. If the vehicle reports miles per kilowatt-hour instead, convert it:
kWh per 100 miles = 100 ÷ miles per kWh
Then estimate the energy stored in the battery for driving:
Driving energy = monthly miles × kWh per 100 miles ÷ 100
2. Add charging losses
Charging losses are the difference between energy delivered to the battery and energy drawn at the meter. For a worksheet, use a stated planning assumption, such as 10%, then replace it with measured data if your utility bill and vehicle records allow. The formula is:
Meter energy = driving energy × (1 + loss percentage)
For example, with a 10% assumption, multiply battery energy by 1.10. Do not apply losses twice if your vehicle’s reported consumption already reflects wall-to-battery energy.
3. Apply the complete variable rate
For each charging period, add all per-kWh charges that apply:
Effective rate = supply or generation rate + delivery charges + applicable variable taxes and fees
Multiply the meter energy charged in that period by the effective rate. With time-of-use rates, split charging among peak, off-peak, and shoulder periods instead of using one average price.
4. Handle fixed fees and demand charges separately
A monthly customer charge is not caused solely by EV charging, so show it separately when comparing plans. If a plan adds an EV-specific fee, include that fee in monthly charging cost, but identify it as a plan cost rather than a per-session cost.
Demand charges require special care. They are based on your highest measured power demand during the utility’s billing interval, not simply the number of kilowatt-hours used. If your home already has a demand charge, estimate the incremental amount caused by EV charging only when you understand the utility’s measurement rules. Otherwise, present a range or mark the demand component as unknown rather than assigning it an unsupported value.
Inputs and assumptions worksheet
Copy this worksheet into a spreadsheet or print it for a monthly review.
| Input | Your value | Where to find it |
|---|---|---|
| Monthly driving miles | _____ miles | Trip records or odometer |
| Vehicle efficiency | _____ kWh/100 miles | Vehicle display or manual |
| Charging-loss assumption | _____ % | Measured data or stated estimate |
| Monthly energy at meter | _____ kWh | Miles × efficiency ÷ 100 × (1 + losses) |
| Flat or off-peak effective rate | $_____ / kWh | Full utility bill rate |
| Peak effective rate | $_____ / kWh | Time-of-use tariff or bill |
| Monthly EV plan fee | $_____ | Rate sheet or account terms |
| Demand-charge impact | $_____ or unknown | Utility tariff and bill |
For solar households, distinguish between solar energy used directly by the charger, energy drawn from the grid, and solar energy exported. A kilowatt-hour that would otherwise be exported may have an opportunity cost equal to the export credit you forgo. If export compensation varies by time, apply the relevant credit to the charging period. If solar production and vehicle charging do not overlap, do not count daytime solar as free unless a battery or managed charging actually shifts that energy to the vehicle.
For a plan comparison, use these formulas:
- Session cost: session meter kWh × applicable effective rate + allocated fees + applicable demand cost − applicable solar opportunity credit.
- Cost per 100 miles: monthly charging cost ÷ monthly miles × 100.
- Monthly charging cost: sum of all period costs + EV-specific fees + incremental demand cost.
Allocate a fixed fee only if you need an all-in comparison. One reasonable method is to divide the fee across the household’s total monthly kWh, then assign the EV its share. Keep the unallocated fee visible because changing plans may affect the whole home, not just the car.
Worked examples
The following figures are illustrative assumptions, not current prices or a recommendation.
Flat-rate plan
Assume 1,000 monthly miles, vehicle consumption of 30 kWh per 100 miles, and 10% charging losses:
Driving energy = 1,000 × 30 ÷ 100 = 300 kWh.
Meter energy = 300 × 1.10 = 330 kWh.
At an illustrative all-in rate of $0.20 per kWh, energy cost is 330 × $0.20 = $66. The energy-only cost per 100 miles is $6.60. Any monthly customer charge should be displayed separately or allocated transparently.
Time-of-use plan
Suppose 70% of the 330 kWh is charged during an illustrative off-peak period at $0.12 per kWh and 30% during a peak period at $0.32 per kWh.
Off-peak cost = 231 × $0.12 = $27.72.
Peak cost = 99 × $0.32 = $31.68.
Total energy cost = $59.40, or $5.94 per 100 miles before plan fees and demand charges. This example shows why the cheapest time to charge depends on your actual schedule: a lower off-peak rate helps only when the vehicle can charge in that window and the plan’s other charges do not erase the difference.
Solar-assisted charging
Assume 100 kWh of the month’s 330 kWh is supplied by surplus solar that could otherwise have earned an illustrative export credit of $0.06 per kWh. The remaining 230 kWh is purchased from the grid at an illustrative effective rate of $0.20 per kWh.
Grid cost = 230 × $0.20 = $46.
Solar opportunity cost = 100 × $0.06 = $6.
Estimated charging energy cost = $52, or $5.20 per 100 miles, before fixed fees. If the solar would have been curtailed rather than exported, its opportunity cost may be lower. Check the export rules and your actual bill before treating solar charging as zero-cost.
When to recalculate
Revisit the worksheet whenever your electricity rate, driving pattern, or charging setup changes. A practical schedule is monthly, after reviewing the utility bill, and quarterly for a broader plan comparison. Recalculate immediately after:
- Switching to or leaving a time-of-use or EV-specific plan.
- Changing the vehicle, commute, charging limit, or charging location.
- Installing solar, a home battery, or a managed Level 2 charger.
- Receiving a new rate sheet, delivery charge, export credit, or demand-charge notice.
- Adding a second EV or other large electrical load.
- Receiving a charger, electrical-upgrade, utility, or local incentive that changes total ownership cost.
For the next review, compare your worksheet’s estimated meter energy with the utility bill and charger records. If the numbers differ, check charging losses, public charging sessions, seasonal driving, and whether the utility assigns rates by the time energy is delivered rather than the time charging begins. Then update the assumptions and test at least two schedules: your current behavior and a realistic off-peak or solar-aligned schedule. The lowest advertised rate is not automatically the lowest household cost; the best comparison is the one based on your complete bill and a schedule you can consistently follow.